EPC materials across 50 sites — without losing a single delivery window
Project logistics runs on phone calls, Excel trackers, and vendor promises. When a steel beam arrives 3 days late to Site 7, the cascade hits your timeline and your margins. Fretron makes every delivery trackable, every vendor accountable.
Fretron’s rails were built where logistics is hardest — 1M+ shipments a year, ₹10,000 Cr+ freight orchestrated for India’s biggest manufacturers











Common Challenges
How it breaks when every system holds its own truth.
20+ vendors delivering to 50+ sites simultaneously — steel from Raipur, glass from Firozabad, cement from local plants. Each with different lead times, and zero shared visibility.
One late delivery cascades across the entire project timeline — a delayed steel shipment holds up structural work at 3 sites, pushing every downstream trade by weeks.
Dispatch coordinators run on WhatsApp groups per site, vendor delivery promises tracked in Excel. Nobody knows a shipment is late until the site supervisor calls asking where the material is.
Built for EPC & Building Materials
An EPC project is a moving target — sites can double in a quarter. Steel from Raipur, glass from Firozabad, cement locally: twenty vendors, fifty sites, crew waits on the beams. Run on WhatsApp and Excel, nobody knows a shipment slipped until the supervisor calls. Fretron puts dispatch on one record: sequenced to phase, tracked in transit, proven with ePOD.
Key Capabilities
Every capability below reads — and writes — the same record.
Phase-aligned dispatch planning
Steel, rebar, and cement sequenced across vendors to project milestones — critical-path materials flagged.
Oversized load routing
Flatbeds, low-bed trailers, bridge weight limits, site access widths — fewer rejected entries.
What's off, not 50 sites
The record flags a critical delivery slipping or a vendor bill off contract.
Site-gate ePOD
Photo proof, quantity verified against the challan, damage documented — weight checked both ends.
Multi-vendor freight billing
Per-trip, per-tonne, lump-sum — matched to trip data, reconciliation down to 3 days.
Outcomes This Drives
15%
fewer project logistics delays — the cascade caught before it starts
40%
faster vendor delivery coordination
100%
digital proof of delivery at every site
₹2-5 Cr
saved annually on a ₹100 Cr project logistics spend
Frequently asked questions
Why is a logistics platform critical for EPC & construction material logistics?
How does Fretron handle multi-location project deliveries?
Can Fretron manage supplier and vendor coordination?
How does Fretron prevent material loss and pilferage?
How can Fretron improve cost efficiency in EPC logistics?
Still have questions?
Talk to our teamOur credentials
₹10,000 Cr
Freight costs managed
1M+
Shipments handled every year
₹400 Cr
Saved in freight costs
100+
Enterprise clients
Also rated
Rated by the teams who run on it
Beyond the heritage numbers above, Fretron is rated by verified reviewers on G2 and Capterra — and the real proof is your own dispatches: in a demo we run one day of your plant's shipments on one record, plan to gate to dispatch.
See your plant’s dispatch on one record.
Bring one day of dispatches — we’ll trace them across your plants, carriers, and customers.
Book a demo on your project deliveries