New: an honest review of the best logistics software for Indian steel manufacturers.

Read the guide
Industry

EPC materials across 50 sites — without losing a single delivery window

Project logistics runs on phone calls, Excel trackers, and vendor promises. When a steel beam arrives 3 days late to Site 7, the cascade hits your timeline and your margins. Fretron makes every delivery trackable, every vendor accountable.

Fretron’s rails were built where logistics is hardest — 1M+ shipments a year, ₹10,000 Cr+ freight orchestrated for India’s biggest manufacturers

VMartExideBrilliant PolymersVolvoWelspunBajajKIAAmara RajaJindal Steel & PowerCenturyPlyNandan PetrochemJubilant Ingrevia

Common Challenges

How it breaks when every system holds its own truth.

Seam 01 drift

20+ vendors delivering to 50+ sites simultaneously — steel from Raipur, glass from Firozabad, cement from local plants. Each with different lead times, and zero shared visibility.

Seam 02 drift

One late delivery cascades across the entire project timeline — a delayed steel shipment holds up structural work at 3 sites, pushing every downstream trade by weeks.

Seam 03 drift

Dispatch coordinators run on WhatsApp groups per site, vendor delivery promises tracked in Excel. Nobody knows a shipment is late until the site supervisor calls asking where the material is.

Built for EPC & Building Materials

An EPC project is a moving target — sites can double in a quarter. Steel from Raipur, glass from Firozabad, cement locally: twenty vendors, fifty sites, crew waits on the beams. Run on WhatsApp and Excel, nobody knows a shipment slipped until the supervisor calls. Fretron puts dispatch on one record: sequenced to phase, tracked in transit, proven with ePOD.

Outcomes This Drives

15%

fewer project logistics delays — the cascade caught before it starts

40%

faster vendor delivery coordination

100%

digital proof of delivery at every site

₹2-5 Cr

saved annually on a ₹100 Cr project logistics spend

Frequently asked questions

Why is a logistics platform critical for EPC & construction material logistics?
EPC projects require the timely and cost-effective movement of heavy machinery, raw materials, and construction components. A logistics platform ensures on-time deliveries and real-time tracking, reducing project delays.
How does Fretron handle multi-location project deliveries?
Fretron enables centralized planning and tracking for deliveries across multiple project sites. It provides visibility into material movement, ensuring accurate ETAs and minimizing stockouts.
Can Fretron manage supplier and vendor coordination?
Yes, Fretron integrates with supplier and vendor portals, ensuring unified coordination for dispatch planning, freight procurement, and payment reconciliation.
How does Fretron prevent material loss and pilferage?
Real-time tracking, geo-fencing, and automated alerts ensure shipments follow designated routes. Digital proof of delivery (ePOD) eliminates invoice fraud and unauthorized deliveries.
How can Fretron improve cost efficiency in EPC logistics?
By optimizing multi-modal transportation, reducing empty miles, and automating freight audits, Fretron helps EPC companies lower logistics costs while maintaining project timelines.

Still have questions?

Talk to our team

Our credentials

₹10,000 Cr

Freight costs managed

1M+

Shipments handled every year

₹400 Cr

Saved in freight costs

100+

Enterprise clients

Also rated

Rated by the teams who run on it

Rated 4.4 on G2 and 4.8 on Capterra by verified reviewers.

Beyond the heritage numbers above, Fretron is rated by verified reviewers on G2 and Capterra — and the real proof is your own dispatches: in a demo we run one day of your plant's shipments on one record, plan to gate to dispatch.

See your plant’s dispatch on one record.

Bring one day of dispatches — we’ll trace them across your plants, carriers, and customers.

Book a demo on your project deliveries
Review build